BaBar Level 1 Drift Chamber Trigger Upgrade
Abstract
As PEP-II is exceeding the original design luminosity, BaBar is currently upgrading its Level 1 Drift Chamber Trigger (DCT) to reduce the rate of background Level 1 triggers by more than 50% while preserving the high Level 1 trigger physics efficiency. New Z-Pt-Discriminator VME boards (ZPD) utilizing the stereo hit information from the drift chamber are being built to extract the track z coordinate at the beam line with a resolution of a few centimeters.
0
Turn this paper into a full lesson
ArcXiv compiles a staged curriculum from this paper: 8-12 lessons across beginner → advanced, synthesised section guides, visuals, flashcards, a quiz, exercises, and on-demand deep dives per section. Grounded in the abstract, never invented.