Commissioning of the 1.4 Mev/u High Current Heavy Ion Linac at Gsi
W. Barth
Abstract
The disassembly of the Unilac prestripper linac of the Wideroe type took place at the beginning of 1999. An increase of more than two orders of magnitude in particle number for the most heavy elements in the SIS had to be gained. Since that time the new High Current Injector (HSI) consisting of H-type RFQ and DTL-structures for dual beam operation was installed and successfully commissioned. The High Charge Injector (HLI) supplied the main linac during that time. Simultaneously conditioning and running in of the rf-transmitters and rf-structures were done. The HSI commissioning strategy included beam investigation after each transport and acceleration section, using a versatile diagnostic test stand. Results of the extensive commissioning measurements (e.g. transverse emittance, bunch width, beam transmission) behind LEBT, RFQ, Super Lens, IH tank I and II and stripping section will be discussed. An 40Ar1+ beam coming from a MUCIS ion source was used to fill the linac up to the theoretical space charge limit. Routine operation started in November 1999.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly