Main steps for the fabrication of IPHI RFQ
M Painchault, J Gaiffier, C Chauvin
Abstract
The RFQ of the project IPHI is a 8 meter long, high power, very precise tolerances (0.01 mm on 1 meter long for example) device to accelerate protons. This RFQ is similar to the RFQ of the LEDA project. So, we realize a thermal and mechanical studies followed by different tests for machining and brazing copper. We describe in this paper those different steps and the way we proceed to supply the fabrication itself by an independent company.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly