Comparisons Between Modeling and Measured Performance of the BNL Linac
D. Raparia, J. G. Alessi, A. Kponou
Abstract
Quite good agreement has been achieved between computer modeling and actual performance of the Brookhaven 200 MeV Linac. We will present comparisons between calculated and measured performance for the beam transport through the RFQ, the 6 meter transport from RFQ to the linac and meching and transport through the linac.
Create a lesson
Related papers
Physics of stabilization and dynamic control of CW magnetrons for superconducting accelerators
G. Kazakevich, R. P. Johnson, I. Gonin et al.
AloHEP Software: A luminosity optimizer for High Energy Physics colliders
Burak Dagli, Yigitali Karaca
Development of a continuous-wave photocathode very-high-frequency electron gun for S3FEL
Lianmin Zheng, Yitong Duan, Yuanyuan Qin et al.
Limits on energy recovery for positron acceleration in a warm plasma column
Max Varverakis, Spencer Gessner, Severin Diederichs et al.
Construction of Approximate Invariants Across Nonlinear Resonances
Yongjun Li, Derong Xu, Yue Hao et al.
Effect of transition layer on wakefield in plasma waveguide
Peter Markov, Kostyantyn Galaydych, Gennadiy Sotnikov