Cost Projections for High Temperature Superconductors
Paul M. Grant, Thomas P. Sheahen
Abstract
It is generally argued that for high-temperature superconductors (HTS) to be cost-competitive in power applications, the wire will have to sell for about 10 per kiloampere meter (10/kAm) for operation at 77 K (e.g., NbTi costs around 1/kAm and Nb3Sn around 8, each at 4.2 K). Given what is already known about the critical current performance of Pb-stabilized Bi-2223 (BSCCO), this cost target may be extremely difficult to realistically achieve for silver-sheathed BSCCO produced by the oxide-powder-in-tube (OPIT) technique. In this paper, we examine the cost of component materials, add reasonable estimates for labor and related costs, and arrive at a likely cost/performance (C/P) figure. We also estimate the capital cost of a factory to produce HTS conductor by a particular coated conductor method, and calculate the necessary production-output and performance parameters necessary to manufacture 10 km/yr of wire and its associated C/P. Our results indicate that the real C/P seen by the customer will remain substantially above this $10/kAm target for some time to come.
Create a lesson
Related papers
Altermagnetic Control of Charge-4e Superconductivity
Yan-Guang Yue, Jie Lou, Yan Chen
Electron- and hole-doped superconductivity in two-dimensional electride ZrX2 (X = Cl, Br, I)
Tian-Xin Liu, Xin-Yang Li, Zuo-Wei Yin et al.
Enhanced Coulomb pseudopotentials in high-pressure hydrides from first principles
Kieran Bozier, Chris J. Pickard
Pressure-induced double-dome superconductivity in doped kagome metal Cs(V0.86Ta0.14)3Sb5 without charge density wave
Haochen Sun, Jing Wang, Deng Hu et al.
Electric and Heat Transport in One-Dimensional SNS Junctions with Energy-Dependent Transmission
Kai Tsutsumi, Shun Uchino
From band reconstruction to Bogoliubov dispersion: How dz2-band enhances iron-based superconductivity
Jingming Yan, Shendong Su, Guihao Jia et al.