Operational Aspects of the High Current Upgrade at the Unilac
J. Glatz, J. Klabunde, U. Scheeler, D. Wilms
Abstract
With the new GSI High Current Injector, the beam pulse intensity will be increased by more than two orders of magnitude. The high beam power and the short stopping range at particle energies below 12 MeV/u can destroy accelerator components even during a single beam pulse. Therefore, the operation of the whole accelerator facility has required major changes in hardware, software and operating strategy. A sophisticated beam diagnostic system is indispensable for a safe operation. Preferably non-destructive devices were installed. Destructive elements, e.g. beam stoppers, slits, apertures, were improved in order to withstand the high beam power. Automatic damage prevention was realised by beam loss monitors comparing and evaluating very fast beam current transformer signals. Additionally, the component status will be controlled permanently. For foil stripping at 11.4 MeV/u, a magnetic beam sweeping system was installed Thereby, the hit area will be increased during one 100 micro sec pulse. During operation, manual variation of parameters has to be reduced. Set-up and automatic beam adjustment procedures have to exclude uncontrolled beam loss. The versatility of the UNILAC is enhanced by the possible three-beam operation on a pulse-to-pulse basis. Since November 1999 the upgraded UNILAC is serving the experiments.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly