Upgrade of Linac Control System with New Vme Controllers at Spring-8
T. Masuda, T. Ohata, T. Asaka, H. Dewa, T. Fukui, H. Hanaki, N. Hosoda, T. Kobayashi, M. Kodera, A. Mizuno, S. Nakajima, S. Suzuki, M. Takao, R. Tanaka, T. Taniuchi, Y. Taniuchi, H. Tomizawa, A. Yamashita, K. Yanagida
Abstract
We integrated an injector linac control system to the SPring-8 standard system on September 2000. As a result of this integration, the SPring-8 accelerator complex was controlled by one unified system. Because the linac was continuously running as the electron beam injector not only for the SPring-8 storage ring but also for New SUBARU, we had to minimize the hardware modification to reduce the time for the development and testing of the new control system. The integration method was almost the same as that of the integration of the booster synchrotron. We report here on the integration of the linac control system with emphasis on the upgrade of the VMEbus controllers and software involving the operating system Solaris 7 as the real-time OS.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly