Replacement of Magnet Power Supplies, Control and Field-Bus for the Psi Cyclotron Accelerators
D. Anicic, T. Blumer, G. Dzieglewski, G. Janser, I. Jirousek, H. Lutz, A. C. Mezger
Abstract
Magnet power supplies in the PSI accelerator complex with their control and field-bus are old. Some components are more then 30 years old. To guarantee further maintenance and to meet the more demanding specifications for operation with the 2mA beam, they have to be replaced. The switched power supplies, developed for SLS, will be used. This implies a major redesign of part of the accelerator control system, which is now based on CAMAC, ROAD-C and other in house developed hardware including the machine protection system. The modified control for the new set-up will be based on VME and alternatively CAMAC, with dedicated processors for the functionality of the machine protection system.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly