Introduction of Modern Subsystems at the KEK Injector-linac
N. Kamikubota, K. Furukawa, S. Kusano, T. Obata
Abstract
As an accelerator control system survives over several years, it is often the case that new subsystems are introduced into the original control system. The control system for the KEK electron/positron injector-linac has been using Unix workstations and VME computers since 1993. During the eight-year operation, we extended the system by introducing a) Windows PCs, b) PLC controllers with a network interface, and c) web servers based on modern information technology. Although such new subsystems are essential to improve control functionalities, they often cause communication problems with the original control system. We discuss the experienced problems, and present our solutions for them.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly