Minimization of Transverse Wakefields in the NLC Accelerator Structures
R. M. Jones, R. H. Miller, J. W Wang
Abstract
The progress of a multiple bunches of electrons through several thousand accelerator structures results in a wakefield which if left unchecked will kick successive bunches off the axis of the accelerator and can at the very least dilute the final luminosity of the final colliding beams, or at worst can lead to a BBU (Beam Break Up) instability. In order to damp the wakefields to acceptable levels for travelling wave structures we detune the frequencies of the cells and we couple out the field to four adjacent manifolds. Optimizing the manifold-cell coupling for several hundred cells and changing the bandwidth parameters of the distribution has in previous structures been achieved by a process of trial and error. Here, we report on an optimized Fortran code that has been specifically written with the aim minimizing the sum of the squares of the RMS and standard deviation of the sum wakefield. Sparse matrix techniques are employed to reduce the computational time required for each frequency step. The wakefield is minimized whilst ensuring that no significant local surface heating occurs due to slots cuts into the accelerator cells to couple out the wakefield.
Create a lesson
Related papers
Reconstruction of Beam Transverse Parameters in the Fermilab Side-Coupled Linac Using a Normalized Coordinate Framework
E. V. Chen, J-P. Carneiro, R. V. Sharankova et al.
Coherent collective amplification of terahertz microbunching seeded by laser frequency beating in relativistic electron beams
Wencai Cheng, Yin Kang, Kaiqing Zhang et al.
Heavy ion driven plasma wakefield acceleration with drift-like phase-shift acceleration scheme
Li Jiangdong, Xia Guoxing, Liu Jie et al.
Ultralow Mean Transverse Energy and High Quantum Efficiency Cryogenic Bialkali Photocathode for MHz-Repetition-Rate Electron Sources
D. Wang, S. Liu, J. Liu et al.
First Cobotic-Assisted String Assembly of PIP-II SSR2 Cavities at Fermilab
M. Parise, T. Aiazzi, C. Narug
PIP-II Project Progress and Challenges
O. Napoly